Solvent Cement

UPVC Solvent

CPVC Solvent

Rubber Lubricant
Direction For Uses
- Wear safety glasses with side shields and wear rubber gloves
- Square pipe ends, chamfer and remove all dirt
- Check dry fit of pipe and fitting. Pipe should easily go 1/3 of the way into the fitting. If pipe bottoms, it should be snug
- Use a suitable applicator at least 1/2 the size of the pipe diameter. For larger size pipe systems use a natural bristle brush or roller
- Clean pipe and fitting with a primer
- Apply liberal coat of cement to pipe to the depth of the socket, leave no uncoated surface
- Apply a thin coat of cement to inside of fitting, avoid puddling of cement. Puddling can cause weakening and premature failure of pipe or fitting. Apply a second coat of cement to the pipe.
- Assemble parts QUICKLY. Cement must be fluid If cement surface has dried, recoat both parts
- Push pipe FULLY into fitting using a 1/4 turning motion until pipe bottoms
- Hold pipe and fitting together for 30 seconds to prevent pipe push-out – longer at low temperatures. Wipe off excess
- Allow 15 minutes for good handling strength and 2 hours cure time at temperatures above 60°F before pressure testing up to 180 psi. Longer cure times may be required at temperatures below 60°F or with pipe above 3″. DO NOT TEST WITH AIR OR COMPRESSED GAS